
Preliminary Procedures Clean and Inspect the carrier as an assembly. If wear ordamage is found disassemble to replace the affectedcomponent. | |
1 | Reaction Internal Gear Retaining Ring |
2 | Reaction Carrier Internal Gear |
3 | Output Carrier Assembly |
Drive Range, First Gear Engine Braking (Gen 2/Hybrid) Automatic Transmission Unit
Output Speed Sensor Replacement Automatic Transmission UnitFront Wheelhouse Liner Replacement (Terrain) Panels Wheel Well Liner
Front Wheelhouse Liner ReplacementCalloutComponent NamePreliminary ProcedureRemove the tire and wheel assembly. Refer toTire and Wheel Removal and Installation.1Front Wheelhouse Liner Screw (Qty:-3)Caution:Refer toFastener Caution.Tighten3-Y(27-lb-in)2Front Wheelhouse Liner Push-In Retainer(Qty:-11) ...