
Install the NEW water outlet seals-(3)and-(4).Install the water outlet-(2).
Caution:Refer toFastener Caution.
Install the water outlet bolts-(1) and tighten to10-Y(89-lb-in).
Secondary Air Injection Check Valve Installation - Bank 2 Emissions Air Injection
Intake and Exhaust Camshaft, Bearing Cap, and Lash Adjuster Removal (LAF, LEA, or LUK) Valvetrain Valve Actuating Assembly Valve Tappets/LiftersTiming Chain Idler Sprocket Installation - Right Side Valvetrain Valvetrain Timing Timing Belt/Chain
Ensure that the right camshaft intermediate drive chainidler-(1) is being installed. The recessedhub-(4) and the smaller sprocket of the right camshaftintermediate drive chain idler is installed outward. The raised huband the larger sprocket of the right camshaft intermediate drivechain idler is ins ...