After the scheduled services are performed, record the date,odometer reading, who performed the service, and the type ofservices performed in the boxes provided. Retain all maintenancereceipts.
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
- | - | - | - - |
Title Page
Capacities and SpecificationsSecondary Air Injection Check Valve Cleaning and Inspection Emissions Air Injection
Inspect the secondary air injection-(SAI) checkvalve for the following:Damage to the SAI check valve feed pipefitting-(1)Damage to the SAI check valve mounting boltholes-(2)Damage to the SAI check valve gasket sealingsurface-(3)Damage to the SAI check valve inletport-(4)Replace the SAI check valve a ...