
Install the NEW water outlet seals-(3)and-(4).Install the water outlet-(2).
Caution:Refer toFastener Caution.
Install the water outlet bolts-(1) and tighten to10-Y(89-lb-in).
Secondary Air Injection Check Valve Installation - Bank 2 Emissions Air Injection
Intake and Exhaust Camshaft, Bearing Cap, and Lash Adjuster Removal (LAF, LEA, or LUK) Valvetrain Valve Actuating Assembly Valve Tappets/LiftersFront Side Door Garnish Molding Replacement Trim Panels/Welts
Front Side Door Garnish Molding ReplacementCalloutComponent NamePreliminary ProcedureRemove the front side door trim panel. Refer toFront Side Door Trim Panel Replacement.1Front Side Door Garnish Molding RetainerProcedureUse a door trim panel removal tool or equivalent to aid inthe removal of the re ...