Chevrolet Equinox manuals

Chevrolet Equinox Service Manual: Intake Manifold Installation Intake and Forced Induction Intake Manifold

Chevrolet Equinox Service Manual / Powertrain / Engine / Intake Manifold Installation Intake and Forced Induction Intake Manifold

Intake Manifold Installation Intake and Forced Induction Intake Manifold

Install the NEW intake manifold gasket-(1).

Intake Manifold Installation Intake and Forced Induction Intake Manifold

Install the intake manifold assembly-(2).Install the intake manifold bolts-(1).

Intake Manifold Installation Intake and Forced Induction Intake Manifold

Caution:Refer toFastener Caution.

Tighten the intake manifold bolts in the sequenceshown.Tighten the intake manifold bolts in sequence to25-Y(18-lb-ft).Tighten the intake manifold bolts a second pass in sequenceto25-Y(18-lb-ft).

Intake Manifold Installation Intake and Forced Induction Intake Manifold

Install the fuel pump cover-(2).Install the fuel pump cover bolt-(1) and tightento10-Y(89-lb-in).

Intake Manifold Installation Intake and Forced Induction Intake Manifold

Connect the evaporative-(EVAP) hose to the upperintake manifold and EVAP solenoid.

Intake Manifold Installation Intake and Forced Induction Intake Manifold

Connect the positive crankcase ventilation-(PCV)tube assembly-(1) to the upper intake manifold and theright camshaft cover.

Engine Front Cover and Oil Pump Installation Engine Block Cylinder Block Cyl Block Front Cover
Install the engine front cover-(1) with a newgasket-(2).Caution:Refer toFastener Caution.Note:The center bolt-(1) should be tightenedlast.Install the engine front cover bolts and tighten to25-Y-(18-lb ...

Intake Manifold Assemble Intake and Forced Induction Intake Manifold
Install the NEW plastic compressionlimiters-(1).Install the NEW lower intake manifoldgaskets-(3).Install the lower intake manifold-(2) andbolts-(1).Caution:Refer toFastener Caution.Tighten the lower i ...

Other materials:

Output Carrier Cleaning and Inspection Automatic Transmission Unit
Output Carrier Cleaning and InspectionCalloutComponent NamePreliminary ProceduresClean and Inspect the carrier as an assembly. If wear ordamage is found disassemble to replace the affectedcomponent.1Reaction Internal Gear Retaining Ring2Reaction Carrier Internal Gear3Output Carrier Assembly ...

© 2017-2026 Copyright www.cequinox.com