Preliminary Procedure Raise and support the vehicle.Refer toLifting and Jacking the Vehicle | |
1 | Catalytic Converter Nuts (Qty:-2) Caution:Refer toFastener Caution. ProcedureClean and inspect the studs on the engine cylinder head,replace as necessary.Verify that the studs are fully seated. Stud collar shouldtouch the surface of the engine cylinder head.Tighten nuts in a criss-cross pattern.Tighten22-Y(16-lb-ft). |
2 | Catalytic Converter Heat Shield-Left |
3 | Catalytic Converter Nuts (Qty:-2) Caution:Refer toFastener Caution. ProcedureClean and inspect the studs on the engine cylinder head,replace as necessary.Verify that the studs are fully seated. Stud collar shouldtouch the surface of the engine cylinder head.Tighten nuts in a criss-cross pattern.Tighten22-Y(16-lb-ft). |
4 | Catalytic Converter Heat Shield-Right |
Input, Reaction, and Output Carrier Installation Automatic Transmission Unit
Input, Reaction, and Output Carrier InstallationCalloutComponent NamePreliminary ProcedureNote location of the orientation lip on bearings. All thrustbearings can only be assembled one way.1Input Shaft Thrust Bearing Assembly2Output Carrier Transfer Drive Gear Hub Assembly3Front Differential Transfe ...